Resource Hub / Standard Documents

Standard Documents

Prompt Payment And Construction Lien Act - Plain Language Guides

We have updated our Prompt Payment and Construction Lien Act Plain Language Guides. Please access the documents below:

Prompt Payment FAQs

Gowling WLG prepared a series of FAQs for our members to access about Alberta’s Prompt Payment laws:

Access Standard Documents

All other ACA standard documents and guides are sold through the Local Construction Associations only.

CCDC SGS Documents

Supplementary General Conditions (SGCs) are required to align the CCDC suite of contracts with lien legislation that is unique to each province. As CCDC updates the language in its contracts, ACA is able to simplify and streamline the corresponding Alberta SGCs.

 

For more information, please contact ACA or your local LCA.

Trade Definitions

This is intended to assist companies in identifying work to be included or excluded in the bids of Trade Contractors.

For free download, visit the Trade Definitions website at www.tradedefinitions.com

Contract Templates

ACA Form A

Agreement Between Contractor & Subcontractor Standard contract between the prime contractor and subcontractor.

*Requires the Form A Seal*
This document is available in either Electronic or Hard Copy version through the local construction associations.

Form A Seal

Form A Copyright Seal Required for use of the Form A standard contract

ACA Form B

Agreement Between Subcontractor & Sub-Subcontractor Standard contract between the Subcontractor and Sub-Subcontractor.

*Requires the Form B Seal*
This document is available in either Electronic or Hard Copy version through the local construction associations.

Form B Seal

Form B Copyright Seal Required for use of the Form B standard contract

Form C Sup 1

Certificate of Substantial Performance of Prime Contract Used by Prime Contractor to verify work is substantially complete and holdback monies withheld under the contract are to be released in accordance with timing stipulated by the Builders’ Lien Act. Work continues towards total completion.

Form C Sup 2

Certificate of Substantial Performance of Subcontract Used by Subcontractor to verify work is substantially complete and holdback monies withheld under the contract are to be released in accordance with timing stipulated by the Builders’ Lien Act. Work continues towards total completion.

Silica Guides

HSE Best Practice Intended to help companies to protect themselves and their employees against silica dust.

HSE Silica Operating Procedure The purpose of this procedure is to specify methods to protect workers who may be exposed to respirable crystalline silica in construction activities.